On September 1st 2015 we began excavating our driveway and the hole for our basement. We ended up with an amazing excavator named Matt, he was a total ninja with his machine! The excavation took four days and he did a perfect job! As he dug, dump trucks hauled off the debris and dirt.
The entire process took four days.
The excavator arrived!
Getting started
The beginnings of our driveway! |
Simon checking out the new driveway |
Beginning the hole for the basement! |
Watching from the roof with my mom |
Matt climbing out of the hole!
The excavating is done!
Curious cat
Laying out the footings
Tarps to keep the walls from washing away |