Monday, October 19, 2015

Car decking


The fir car decking came from the Second Use, it had been outside for a while so it needed a lot of sanding and oiling, each board took about an hour, and there were about 50 boards all together.


The car decking as we bought it
Sean using the orbital sander to sand the edges
Using the belt sander
Oiling

Sam  coming to check things out



Finished!







Standing in the living room!


View from our future bedroom












Sunday, October 18, 2015

Sanding and oiling the beams

The beams came from an old Seattle warehouse. The warehouse was about a 100 years old, the vertical grain fir is likely 400-500 years old. It is beautiful wood and I like how you can see a few hole from the bolts which suspended it in its original location. The original beams were enormous. We had four 6"x 10" beams milled from half of one original beam!


My mom sanding the beams

My Dad routing the edge of the beams
After the beams were installed!









Goodbye ladders! 

Saturday, October 17, 2015

Finishing the first floor

On October 10th we hired two awesome carpenters to help us frame. They are very fast! We were able to finish framing first floor walls, both interior and exterior.

We framed each exterior wall on the floor in ten foot sections and then raised them up.




Bathroom walls

Friday, October 9, 2015

Framing the first floor!

We are working our way out of the hole! This week we began framing our exterior walls for the first floor. We have lucked out with the weather but are working quickly to get out of the rain!


The footprint is 20ft by 20ft so we are building each wall in 10ft sections so that they are not too heavy to raise

The framing begins

After the car-decking was up, we framed our supporting wall which divides the stairs and laundry room from the rest of the basement.


The first interior wall!

The stairs are on the right and the laundry room on the left

The stairs are almost done

Beams and car-decking

After pouring our basement walls, our next step was to set our beams and then lay the car-decking sub-floor on top of them.

We lightly sanded each board to knock the dirt off


View of our basement ceiling!

After the car-decking we nailed down a layer of 3/4 inch plywood.

Pouring the walls

On September 22 the concrete truck and pumper truck showed up at 8 am and we began pouring our walls. We poured two feet at a time with 30 minute breaks to prevent our forms from blowing out. This was hard work! The hose was very heavy, it took three of us to handle it!


At the top of the wall we set our j-bolts, all thread (which will hold our building onto the concrete) and pressure treated ledger boards. When everything was set we hand troweled the top to make a smooth place for our sill plates to sit.

Below is a time lapse video of building the scaffolding and pouring the walls.