After finishing the car decking and laying plywood over it we moved on to the second floor! We had our amazing carpenters back for two Saturdays. Similar to the first floor, we built the walls on the floor and then raised them up.
After waterproofing the basement walls we were ready to back fill! We had the same amazing excavator back. The time-video shows the placement of the pipes and conduit for water, sewer, cable, electrical, and gas. It also includes the placement of the sump well that pumps water from the footing drains.